Firefly Aerospace doubles Texas facilities to support composite rockets_Overseas information_news_China composite information network

Firefly Aerospace doubles Texas facilities to support composite rockets

   Date:2024-03-01     Source:CompositesWorld     Hits:111     Comment:0    
Core tips:Company grows test stands, further implements AFP and seven-axis robotic powermill machinery to produce rockets up to nine times faster at 1/7th of the cost.

 
 

Newly installed Ingersoll automated fiber placement (AFP) machine. Source (All Images) | Firefly Aerospace

On Feb. 28, Firefly Aerospace Inc. (Cedar Park, Texas, U.S.) held an official ribbon cutting in celebration of the company’s Rocket Ranch expansion in Briggs, Texas. Firefly more than doubled the size of its manufacturing facilities, added two new test stands, and installed state-of-the-art machinery to support the production of Northrop Grumman’s (Falls Church, Va., U.S.) Antares 330 and the medium launch vehicle (MLV) the companies are co-developing together, which are leveraging Firefly’s composite technologies.

Firefly’s expanded manufacturing space from 92,000 to 207,000 square feet includes two new, large-scale buildings for rocket production, assembly and integration. The company also built a higher thrust engine stand to test Firefly’s Miranda and Vira engines with up to 230,000 pounds of thrust and five times the load capacity as Firefly’s current Reaver and Lightning engine stand. Designed to accommodate three engine bays as production cadence increases, the new stand provides redundant, high-accuracy thrust and mass flow rate data to further improve mission assurance.

The expansion also includes a new, 100-foot structural test stand to conduct pressurized axial loading to mimic flight loads. In total, Firefly now has six test stands at its Briggs location to support the robust testing performed across all vehicle lines.

“After Firefly signed the MLV agreement with Northrop Grumman, we went immediately to work on our Briggs expansion, which has been completed in less than a year’s time,” Bill Weber, CEO of Firefly Aerospace, says. “Along with the expansion, we’re taking advantage of automated machinery to further advance our rapid production schedule while improving efficiencies and lowering costs.”

 
Multi-bay engine test stand.

New multi-bay engine test stand for MLV’s first stage Miranda engines and second stage Vira. 

Firefly is using a new automated fiber placement (AFP) machine, sourced from Ingersoll Machine Tools Inc. (Rockville, Ill., U.S.), a brand of Camozzi Group’s Machine Tool Division, to rapidly fabricate the carbon fiber composite structures, including barrels, domes and other structures, for the first stage of Antares 330 and both stages of MLV. Now operational, the AFP machine was recently used to build Firefly’s first carbon fiber barrel for MLV development testing.

 

“Firefly’s new AFP machinery, which is already widely used and proven in the aircraft industry, is a significantly more efficient and cost-effective approach to rocket production and can be utilized for composite parts across our vehicle lines,” Dan Fermon, COO of Firefly Aerospace, notes. “These high-speed robotic machines can lay up more than 200 pounds of carbon fiber per hour, allowing us to produce all the large carbon [fiber] composite structures for Alpha in just 7 days and MLV in just 30 days. This is about nine times faster and seven times cheaper than our former process using high-touch laser placement systems.”

 
 

In addition to the AFP machine, Firefly is also installing a seven-axis robotic powermill to drill and trim carbon fiber structures with high speed and accuracy. This multi-axis machine, also procured from Ingersoll Machine Tools, can rotate rocket barrels up to 5.5 meters (18 feet) in diameter with a built-in dust collection system.

Other recent facility expansions include two new mission operations centers at Firefly’s spacecraft facility in Cedar Park, Texas, to support a growing number of launch, lunar and on-orbit missions. Firefly also expanded its Cedar Park headquarters with a mezzanine to accommodate nearly twice as many employees.

 
 
More>Similar news

Recommend news
Click rank

Home  |  About Us  |  Contact Us  |  Agreement  |  Copyright  | 
Hotline:400 9696 921  Tel:0534-2666809    Fax:0534-2220102    Email:frp@cnfrp.com
工信部备案号:鲁 B2-20041020号 Copyright (c) 2002-2020 CNFRP.COM All Rights Reserved. 

  Lu public network security: 37140202000173